Siemens Wind Turbine Facility

Back

Project Details

City:

Hutchinson

State:

KS

Size of Project:

300,000 ft.²

Duration:

10 Months

Project Type:

Design/Build

Revit/BIM:

no

Details:

This facility achieved LEED® Gold Certification and is Siemens’ first LEED® Gold certified production facility in the U.S. and is the first LEED® Gold new construction/industrial site in Kansas.

Power Distribution:

(2) 2500kva Utility Transformers (1) 4000a MSB 480/277v 3ph, 4w Tie Section (7) 200’ Bus Duct 800a 480v, 3ph, 3w (2) 140’ Bus Duct 800a 480v, 3ph, 3w (2) 600a MLO 480v, 3ph, 3w ( 13) 400a MLO 480v, 3ph, 3w (19) Convenience & Distribution Panels (5) Emergency Fed Distribution Panels (1) 750kva Transformer 690/400v

Special Systems:

Build Out of MDF & IDF’s Install Owner Supplied Equipment for Fire Alarm & Access Control Systems 12 Strand OM3 Fiber Backbone Cabling (1) 25 Pair Cat 3 Voice Feeder Cabling (1) 50 Pair Cat 3 Voice Feeder Cabling Infrastructure and System Installation for Intercom & Sound Masking (394) Cat 6A UTP Blue Cables for Data (221) Cat 5e UTP White Cables for Voice

Equipment Hookups:

(5) Dock: Doors, Levelers & Restraints (17) Motorized Air Curtains (30) Battery Charging Stations HVAC Equipment Elevators