Siemens Gas Turbine Facility

Back

Project Details

City:

Charlotte

State:

NC

Size of Project:

490,000 ft.²

Duration:

8 Months

Project Type:

Design/Build

Revit/BIM:

yes

Details:

LEED® Gold Certified

Power Distribution:

(5) 15kv—480v Double Ended Unit Sub Stations 20’ off the ground (Included in this) (2) 3000kva Substations (6) 2000kva Substations (1) 1500kva Substations (1) 1000kva Substations 15kv Double Redundant 15kv Feeds Main-Tie-Main on 480v side (minimize downtime possibility) (2) 5000a Switchboards (6) 3200a Switchboards (1) 2400a Switchboards (1) 1000a Switchboards (55) Convenience Power & Distribution Panels 4,620’ LFT of various sized/amperage Bus Duct

Equipment Hookups:

(35) Total Cranes(1) 450 Ton Crane (1) 250 Ton Crane

Misc:

Modified existing 15kv line up; all UL inspected to energize 30% of the project was above 100’ above the ground Intense schedule—First Hanger installed on April 15 and first T.C.O. received on August 15.