Mitsubishi Power Systems Americas

Back

Project Details

City:

Fort Smith

State:

AR

Size of Project:

230,000 sqft

Duration:

11 Months

Project Type:

Design/Build

Revit/BIM:

No

Details:

LEED® Gold Certified

Power Distribution:

(1) 4000a MSB 480/277v 3ph, 4w (1) 1600a MLO 480/277v 3ph, 4w (1) 1200a MLO 480/277v 3ph, 4w (4) 400a MLO 480/277v 3ph, 4w (1) 400a MLO 480/277v 3ph, 3w (1) 400a MCB 480/277v 3ph, 3w (21) Power & Distribution Panels

Equipment Hookups:

(2) 90 Ton Overhead Cranes (3) Various Overhead Cranes (1) 150hp Fire Pump Dock: Doors, Levelers & Restraints

Misc:

This is the company's first nacelle production plant located in the United States.