Hitachi Powdered Metals Inc.

Back

Project Details

City:

Greensburg

State:

IN

Size of Project:

128,000 sqft

Duration:

10 Months

Project Type:

Design/Build

Revit/BIM:

No

Power Distribution:

(2) 4000a 480/277v 3ph, 4w MSB's (1) 4000a 208/120v 3ph, 4w MSB (2) 1000a 208/120v 3ph, 4w DP's (1) 1000a 480v 3ph, 3w MCC (6) 600a 480/277v 3ph, 4w MLO's (6) 400a 208/120v 3ph, 4w DP's (4) 400a 480/277v 3ph, 4w MLO's (13) Power & Distribution Panels

Special Systems:

Access/Control Fire Alarm Paging Tele Data

Equipment Hookups:

Dock Doors and Equipment Welding Receptacles Battery Charging Stations Overhead Doors Overhead Cranes

Misc:

Process: (3) 800a Furnaces (2) 800 Ton Presses (5) 600a Metal Particle Testers