Kentucky
(859) 255-9546
2421 Fortune Dr., Suite 150
Lexington, KY 40509

Kentucky
(502) 261-8455
11441 Blankenbaker Acs Dr.
Louisville, KY 40299-6418

Tennessee
(731) 286-2772
1106 East Court St.
Dyersburg, TN 38024

MEDS & FOOD FOR KIDS

Amteck completes Medika Mamba Processing Facility in Haiti!

E-tailer Projects Pull The Wire

Between (2) Concurrent Projects; Amteck Pulled 2,157,270 ft. of MC Cable or 408 Miles

Jack Daniels Cooperage

Amteck Louisville lands Brown-Forman contract with Encompass Corporation. The new barrel-making facility is expected be up and running by the spring of 2014. The finished facility will be approximately 170,000 ft.²

Ascena Retail Group Expansion

Amteck has been awarded the electrical contract as part of the Design/Build team assembled by Gray Construction to complete a 760,000 ft.² Expansion located in: Etna, OH

Hitachi Incorporated – Greensburg, IN

Amteck teams up with Gray Construction to land Hitachi’s Powdered Metals Addition! This project will elevate the companies capacity of valve timing control systems at its Greensburg plant by 150% as well as add approximately 125,000 ft.² to their existing operations.

NTN Bower Manufacturing Facility

Amteck lands another project with Gray Construction. Amteck has been selected as the design/build electrical contractor for NTN Bower’s 240,000 ft.² Manufacturing Facility in Macomb, IL.

Amteck, Caterpillar, & Gray Together Again

Amteck has landed it’s sixth project award in the last two-and-a-half years with Caterpillar Inc. It also marks its second facility in as many years under Gray Construction. The 1,000,000 ft.² facility located in Athens, GA will manufacture small track-type tractors and mini hydraulic excavators. … Read More »

Appalachian Regional Medical Center

Amteck has been selected as the Electrical Contractor under Denham-Blythe Co. to construct a new 105,000 ft.² Hospital in Hazard, KY. The project will include a new patient tower with a new 24-bed emergency department on the first floor, a dedicated 16-bed cardiac critical care … Read More »

Chelten House Products Inc. – Las Vegas, NV

Amteck lands a new Food & Beverage facility with Gray Construction. The new 86,000 ft.² facility will manufacture and private label organic and premium sauces and salad dressings.

Project Bunge – Bradley, IL

Amteck lands contract to perform a 36,000 ft.² warehouse addition to an existing facility for Bunge North America, Inc. under RFW Construction.